March 27 - 28 Ductwork framing started !

Although it will take more then 2 days to get all the duct work and pipes that stick out of the ceiling covered and ready for drywall we made some progress considering in both days we worked about 6 hours. Hardest part is probably leveling every thing. I build them from 2x2s and then 1x2 or 1x3s for support to save some height.

Also I have finished insulation of cold water 1/2" pipe all over the basement something that builder didn't do. That way we won't get moisture dropping down on finished drywall. Used about 10 of 8ft long foam pipe insulation cost of about 20 bucks probably the cheapest material I bought so far.

Time spent: 12 hrs