Saturday, March 24, 2012

Mar 19 - 20 Plumbing & Drainage Clean up

Even tho we did spent 12 or more hours in these two days working it really doesn't show.

March 19: We started our day with removing old pink insulation that was covering concrete slab kind of half way. It was cut about 15" so it can be re-used when we put up the framing. This actually went pretty quickly we had everything packed up in bags in about 2-3 hrs.

Next it was noticed there is a long about 8' long drainage pipe just below the ceiling joists that would be in a way of drywall. It got moved closely against the wall so 2x4 can be trimmed and go inside the wall so we don't loose ceiling height.

March 20: Moving draining pipes continued. I guess you can't expect the builder to put the drain pipes nicely out of the way. Ours were right in the middle where future storage room will be.
6 hrs later the drain pipes are nicely tacked in against the wall where they will stay.
Pictures coming soon

Time spent: 12 hrs

Before:



After



The other side where pipe was running in the middle of the ceiling, it got moved nicely against the wall.