Continued with more electrical work, some changes to existing plans and even though I thought we were close to being done both we did spent whole day, including trip to Home Depot as we run out of 14/2 wire.
Some time was spent on removing existing 4 light fixtures and re-running cold room light and fixture to be hooked up under new circuit.
Installed:
-4 new circuits (not hooked to the pannel yet we need to have licensed electrician to check)
this set up is good to run over 5000 W of total power.
(Good to know 15Amp breaker is ok to support 1440W of continous power but electricians advise to plan for 1200W per 15Amp breaker)
-15 new outlets
-10 light switches
-3 switches for 3 areas will be 3 way set up required 14/3 wire
-19 pot lights in 3 different zones (media room, main room, bar section)
-6 regular light fixtures
This took roughly about 750 ft of 14/2 wire and 75ft of 14/3 wire for 3 way switches
Time Spent: 2x9hrs = 18 work hours.
Cost: 250ft 14/2 wire = 75$ (no hook ups for wire like last bit)