We continued to drywall the ceiling on Oct 21 there was a bit of slow down as unexpected the drywaling of the HVAC system does take bit more time then just flat ceiling.
Also there had to be some time spent on putting insulation on the side as there wouldn't be access to it later by the HVAC section.
Oct 12
Time spent: 2x5hrs: 10 hrs total
Oct 21
Time spent: 2x8: 16 hrs total