Since it was my work day I have continued with drywalling the laundry room.
Things would have moved faster but for about 2 hours I was fixing the frame that was on top of the HVAC ducts. when drywall was put on the sides things were pretty badly leveled.
I had to cut small thing pieces and attached them to existing framing to make it even and then continued with drywalling it.
Time spent: 4.5 hrs
No comments:
Post a Comment